ITAC Assessment: UD0286
ITAC logo
ITAC Assessment: UD0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STRIPS & SHEETS OF STEEL
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area
n/a
Annual Production 47,525
lb
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,000 1,500,000
kWh
Natural Gas $177,000 44,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $155,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,690 - $5,554
92,321
kWh
$(-784.0)
-
MMBtu
$1,920
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,354 - $13,416
264,068
kWh
$(-2,252.0)
-
MMBtu
$3,190
03 2.4239: Eliminate or reduce compressed air usage $543 - $543
7,620
kWh
- -
04 2.5196: Use small number of high output units instead of many small inefficient units $1,105 $6,000 $1,105
15,826
kWh
- -
05 2.3212: Optimize plant power factor $6,809 $12,000 $6,809
-
kWh
- -
06 2.7492: Use proper thickness of insulation on building envelope $117,912 $60,000 - $117,912
-
MMBtu
-
07 2.7494: Install storm windows and doors $47,948 $47,000 - $47,948
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $9,312 - - $9,312
-
MMBtu
-
TOTAL RECOMMENDED $204,673 $125,000 $27,427
379,835
kWh
$172,136
-
MMBtu
$5,110
TOTAL IMPLEMENTED $155,620 $72,000 $26,322
364,009
kWh
$124,188
-
MMBtu
$5,110
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs