Assessment Year | 1989 |
---|---|
Principal Product | STRIPS & SHEETS OF STEEL |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 24 |
Plant Area |
n/a
|
Annual Production | 47,525
lb
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,000 | 1,500,000 |
kWh
|
$0.062 |
Natural Gas | $177,000 | 44,250 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $204,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $155,620 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,690 | - |
$5,554
92,321
kWh
|
$(-784.0)
-
MMBtu
|
$1,920 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,354 | - |
$13,416
264,068
kWh
|
$(-2,252.0)
-
MMBtu
|
$3,190 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $543 | - |
$543
7,620
kWh
|
- | - | |
04 | 2.5196: Use small number of high output units instead of many small inefficient units | $1,105 | $6,000 |
$1,105
15,826
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $6,809 | $12,000 |
$6,809
-
kWh
|
- | - | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $117,912 | $60,000 | - |
$117,912
-
MMBtu
|
- | |
07 | 2.7494: Install storm windows and doors | $47,948 | $47,000 | - |
$47,948
-
MMBtu
|
- | |
08 | 2.7261: Install timers and/or thermostats | $9,312 | - | - |
$9,312
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $204,673 | $125,000 |
$27,427
379,835
kWh
|
$172,136
-
MMBtu
|
$5,110 | ||
TOTAL IMPLEMENTED | $155,620 | $72,000 |
$26,322
364,009
kWh
|
$124,188
-
MMBtu
|
$5,110 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs