ITAC Assessment: UD0282
ITAC logo
ITAC Assessment: UD0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product OPTICAL LENSES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 259
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,000 6,635,111
kWh
Natural Gas $10,669 2,514
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $9,760 $10,000 $9,760
-
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $2,009 $500 $2,483
114,009
kWh
$(-474.0)
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,389 - $6,189
-
kWh
- $(-800.0)
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $950 $1,500 $793
36,342
kWh
- $157
05 2.7245: Use direct air supply to exhaust hoods $1,435 $1,500 - $1,435
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $1,355 $1,350 $1,355
62,134
kWh
- -
TOTAL RECOMMENDED $20,898 $14,850 $20,580
212,485
kWh
$961
-
MMBtu
$(-643.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs