ITAC Assessment: UD0260
ITAC logo
ITAC Assessment: UD0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product METAL STAMPINGS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,778 1,844,959
kWh
Natural Gas $27,262 6,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7442: Keep doors and windows shut when not on use $4,647 $500 $3,200
39,859
kWh
$1,447
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,125 - $3,374
-
kWh
- $(-249.0)
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,025 $2,000 $1,025
12,896
kWh
- -
04 2.2532: Use only amount of air necessary to prevent explosion hazard $1,447 - - $1,447
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $1,399 $180 $1,448
19,930
kWh
$(-109.0)
-
MMBtu
$60
06 2.7111: Reduce illumination to minimum necessary levels $2,469 $200 $2,485
45,135
kWh
$(-241.0)
-
MMBtu
$225
TOTAL RECOMMENDED $14,112 $2,880 $11,532
117,820
kWh
$2,544
-
MMBtu
$36
TOTAL IMPLEMENTED $8,518 $2,680 $5,673
72,685
kWh
$2,785
-
MMBtu
$60
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs