| Assessment Year | 2020 |
|---|---|
| Principal Product | Conveying equipment |
| NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 274 |
| Plant Area |
200,000
ft2
|
| Annual Production | 350
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $102,549 | 1,825,355 |
kWh
|
$0.056 | |
| Electricity Demand | $97,480 | 6,910 |
kW-mo/yr
|
$14.11 | |
| Electricity Fees | $2,239 | - |
|
- | |
| Natural Gas | $39,463 | 8,397 |
MMBtu
|
$4.70 | |
| Waste Disposal Costs | |||||
| Water Usage | $77,668 | 10,166 |
Tgal
|
$7.64 | |
| TOTAL YEARLY COSTS | $319,399 | ||||
| RECOMMENDED SAVINGS* | $42,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $30,930 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,909 | $49,013 |
$14,182
253,258
kWh
|
$12,727
-
kW-mo/yr
|
- | |
| 02 | 2.3212: Optimize plant power factor | $8,582 | $18,054 | - | - | $8,582 | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,014 | $2,340 |
$2,014
35,961
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $536 | $713 |
$395
7,061
kWh
|
$141
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $459 | $320 |
$459
8,199
kWh
|
- | - | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $1,799 | - |
$1,799
32,123
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,763 | $4,560 |
$1,763
31,488
kWh
|
- | - | |
| TOTAL RECOMMENDED | $42,062 | $75,000 |
$20,612
368,090
kWh
|
$12,868
-
kW-mo/yr
|
$8,582 | ||
| TOTAL IMPLEMENTED | $30,930 | $53,893 |
$18,203
325,068
kWh
|
$12,727
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs