ITAC Assessment: UD0256
ITAC logo
ITAC Assessment: UD0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BLACKBOARDS
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 64,333
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,304 240,914
kWh
Natural Gas $15,096 3,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $473 - - $473
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $407 $500 - $407
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $347 $525 $317
4,982
kWh
$(-39.0)
-
MMBtu
$69
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,641 $540 - $1,641
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $894 $4,000 - $894
-
MMBtu
-
TOTAL RECOMMENDED $3,762 $5,565 $317
4,982
kWh
$3,376
-
MMBtu
$69
TOTAL IMPLEMENTED $2,868 $1,565 $317
4,982
kWh
$2,482
-
MMBtu
$69
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs