ITAC Assessment: UD0208
ITAC logo
ITAC Assessment: UD0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CENTRIFUGAL SEPARATION EQUIPMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area
n/a
Annual Production 40
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,910 1,371,043
kWh
Natural Gas $73,322 14,287
MMBtu
LPG $3,882 445
MMBtu
Fuel Oil #2 $18,378 2,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $31,222 $9,000 - $25,312
-
MMBtu
$5,910
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $1,200 $1,200 - $1,200
-
MMBtu
- -
03 2.7261: Install timers and/or thermostats $6,707 $6,500 - $6,707
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,618 $1,500 $4,259
57,444
kWh
$(-729.0)
-
MMBtu
- $1,088
TOTAL RECOMMENDED $43,747 $18,200 $4,259
57,444
kWh
$32,490
-
MMBtu
$5,910
-
MMBtu
$1,088
TOTAL IMPLEMENTED $43,747 $18,200 $4,259
57,444
kWh
$32,490
-
MMBtu
$5,910
-
MMBtu
$1,088
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs