ITAC Assessment: UD0168
ITAC logo
ITAC Assessment: UD0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SCREW MACHINE PRODUCTS
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,665 1,454,572
kWh
Natural Gas $11,422 1,976
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,557 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $2,610 $1,000 $4,662
171,454
kWh
$(-2,052.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $688 $300 $688
(-4,396)
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $1,217 $896 - $1,217
-
MMBtu
04 2.6214: Shut off pilots in standby equipment $536 - - $536
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $506 - - $506
-
MMBtu
TOTAL RECOMMENDED $5,557 $2,196 $5,350
167,058
kWh
$207
-
MMBtu
TOTAL IMPLEMENTED $3,116 $1,000 $4,662
171,454
kWh
$(-1,546.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs