ITAC Assessment: UD0158
ITAC logo
ITAC Assessment: UD0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product DECO APPLIANCE TRIMS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 249
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,004 3,135,991
kWh
Natural Gas $146,213 23,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,705 $1,260 - $1,705
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $434 $280 - $434
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $7,850 $18,000 - $7,850
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $327 $240 $327
5,862
kWh
-
TOTAL RECOMMENDED $10,316 $19,780 $327
5,862
kWh
$9,989
-
MMBtu
TOTAL IMPLEMENTED $2,466 $1,780 $327
5,862
kWh
$2,139
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs