Assessment Year | 1984 |
---|---|
Principal Product | AIRCRAFT PROPELLERS |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 282 |
Plant Area |
n/a
|
Annual Production | 2,880
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,950 | 4,089,977 |
kWh
|
$0.048 |
Natural Gas | $109,634 | 20,079 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,499 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,499 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $3,912 | $510 |
$3,712
111,665
kWh
|
- | $200 | |
02 | 2.7261: Install timers and/or thermostats | $3,450 | $62 |
$385
11,723
kWh
|
$3,065
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,083 | $530 |
$1,373
23,740
kWh
|
$(-290.0)
-
MMBtu
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,318 | - |
$4,318
-
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,736 | $15,100 |
$14,862
290,152
kWh
|
$(-7,126.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $20,499 | $16,202 |
$24,650
437,280
kWh
|
$(-4,351.0)
-
MMBtu
|
$200 | ||
TOTAL IMPLEMENTED | $20,499 | $16,202 |
$24,650
437,280
kWh
|
$(-4,351.0)
-
MMBtu
|
$200 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs