ITAC Assessment: UD0139
ITAC logo
ITAC Assessment: UD0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AIRCRAFT PROPELLERS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 282
Plant Area
n/a
Annual Production 2,880
pieces
Production Hrs. Annual 0
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,950 4,089,977
kWh
Natural Gas $109,634 20,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,912 $510 $3,712
111,665
kWh
- $200
02 2.7261: Install timers and/or thermostats $3,450 $62 $385
11,723
kWh
$3,065
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,083 $530 $1,373
23,740
kWh
$(-290.0)
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,318 - $4,318
-
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,736 $15,100 $14,862
290,152
kWh
$(-7,126.0)
-
MMBtu
-
TOTAL RECOMMENDED $20,499 $16,202 $24,650
437,280
kWh
$(-4,351.0)
-
MMBtu
$200
TOTAL IMPLEMENTED $20,499 $16,202 $24,650
437,280
kWh
$(-4,351.0)
-
MMBtu
$200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs