| Assessment Year | 1984 |
|---|---|
| Principal Product | AIRCRAFT PROPELLERS |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 282 |
| Plant Area |
n/a
|
| Annual Production | 2,880
pieces
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,950 | 4,089,977 |
kWh
|
$0.048 |
| Natural Gas | $109,634 | 20,079 |
MMBtu
|
$5.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,499 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,499 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $3,912 | $510 |
$3,712
111,665
kWh
|
- | $200 | |
| 02 | 2.7261: Install timers and/or thermostats | $3,450 | $62 |
$385
11,723
kWh
|
$3,065
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,083 | $530 |
$1,373
23,740
kWh
|
$(-290.0)
-
MMBtu
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,318 | - |
$4,318
-
kWh
|
- | - | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,736 | $15,100 |
$14,862
290,152
kWh
|
$(-7,126.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $20,499 | $16,202 |
$24,650
437,280
kWh
|
$(-4,351.0)
-
MMBtu
|
$200 | ||
| TOTAL IMPLEMENTED | $20,499 | $16,202 |
$24,650
437,280
kWh
|
$(-4,351.0)
-
MMBtu
|
$200 | ||