ITAC Assessment: UD0133
ITAC logo
ITAC Assessment: UD0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LUMBER-SAWMILL OPERATION
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $1
M
to 5
M
# of Employees 53
Plant Area
n/a
Annual Production 2,490
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,500 1,000,000
kWh
Natural Gas $2,486 430
MMBtu
Wood $38,400 33,024
MMBtu
Other Energy $161,606 42,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Other Energy Savings
01 2.2515: Use optimum thickness insulation $5,281 $5,000 - - $5,281
-
MMBtu
02 2.2515: Use optimum thickness insulation $19,560 $40,500 - - $19,560
-
MMBtu
03 2.6232: Install set-back timers $1,754 $1,271 $1,754
38,687
kWh
- -
04 2.1392: Replace purchased steam with other energy source $3,629 $6,000 - $(-5,760.0)
-
MMBtu
$9,389
-
MMBtu
05 2.2191: Substitute hot process fluids for steam $1,721 $3,000 - - $1,721
-
MMBtu
TOTAL RECOMMENDED $31,945 $55,771 $1,754
38,687
kWh
$(-5,760.0)
-
MMBtu
$35,951
-
MMBtu
TOTAL IMPLEMENTED $5,383 $7,271 $1,754
38,687
kWh
$(-5,760.0)
-
MMBtu
$9,389
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs