ITAC Assessment: HO0061
ITAC logo
ITAC Assessment: HO0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Commercial Refrigerators and Freezers
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 180,000
ft2
Annual Production 1,800
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,659 710,141
kWh
Natural Gas $3,454 500
MMBtu
Fuel Oil #2 $2,940 840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,126 $7,921 $7,126
45,428
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $728 $1,709 $728
4,689
kWh
03 2.4133: Use most efficient type of electric motors $455 $795 $455
2,931
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,754 $3,000 $1,754
11,137
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,286 $28,480 $6,286
40,152
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,899 $280 $2,899
18,464
kWh
TOTAL RECOMMENDED $19,248 $42,185 $19,248
122,801
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs