ITAC Assessment: UD0109
ITAC logo
ITAC Assessment: UD0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ROPES AND TWINES
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,012 2,864,303
kWh
Natural Gas $157,872 28,162
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $4,597 $980 - $4,597
-
MMBtu
02 2.2511: Insulate bare equipment $9,554 $600 $9,554
135,404
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $12,630 $800 - $12,630
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $16,051 $40,000 $(-3,534.0)
(-50,117)
kWh
$19,585
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,827 $6,843 $9,686
145,369
kWh
$(-1,859.0)
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $15,968 $61,880 - $15,968
-
MMBtu
07 2.7441: Replace broken windows and/or window sash $6,651 $5,475 - $6,651
-
MMBtu
TOTAL RECOMMENDED $73,278 $116,578 $15,706
230,656
kWh
$57,572
-
MMBtu
TOTAL IMPLEMENTED $57,310 $54,698 $15,706
230,656
kWh
$41,604
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs