Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product ABRASIVE SPECIALTIES
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,614 162,368
kWh
Natural Gas $10,923 1,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,233 $750 - $1,233
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $1,281 $487 $338
2,638
kWh
$943
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $873 $600 $873
-
kWh
-
04 2.7494: Install storm windows and doors $668 $182 $142
1,172
kWh
$526
-
MMBtu
TOTAL RECOMMENDED $4,055 $2,019 $1,353
3,810
kWh
$2,702
-
MMBtu
TOTAL IMPLEMENTED $1,281 $487 $338
2,638
kWh
$943
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs