ITAC Assessment: UD0105
ITAC logo
ITAC Assessment: UD0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product COATINGS FOR PACKAGING
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 52,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,375 4,283,998
kWh
Natural Gas $499,631 93,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $18,641 $60,000 $(-2,478.0)
(-58,910)
kWh
$21,119
-
MMBtu
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,481 $1,800 $1,481
40,445
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $3,286 $3,840 - $3,286
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,661 $167 $3,306
69,168
kWh
$(-645.0)
-
MMBtu
TOTAL RECOMMENDED $26,069 $65,807 $2,309
50,703
kWh
$23,760
-
MMBtu
TOTAL IMPLEMENTED $5,947 $4,007 $3,306
69,168
kWh
$2,641
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs