ITAC Assessment: UD0091
ITAC logo
ITAC Assessment: UD0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SECURITY WINDOWS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 40
thousand feet
Production Hrs. Annual 1,992
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,395 1,063,892
kWh
Natural Gas $123,787 23,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5195: Change product design to reduce energy requirements $13,041 $4,710 - $13,041
-
MMBtu
02 2.7261: Install timers and/or thermostats $11,682 $4,000 - $11,682
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,369 $2,467 $4,864
46,893
kWh
$(-495.0)
-
MMBtu
04 2.1221: Replace obsolete burners with more efficient ones $3,053 $6,225 - $3,053
-
MMBtu
05 2.7494: Install storm windows and doors $1,186 $2,252 - $1,186
-
MMBtu
06 2.5194: Redesign process $13,696 $30,000 - $13,696
-
MMBtu
TOTAL RECOMMENDED $47,027 $49,654 $4,864
46,893
kWh
$42,163
-
MMBtu
TOTAL IMPLEMENTED $13,696 $30,000 - $13,696
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs