ITAC Assessment: SF0377
ITAC logo
ITAC Assessment: SF0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Railroad Waste Treatment Systems
NAICS 336510: Railroad Rolling Stock Manufacturing
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 70,000
ft2
Annual Production 250
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,732 497,680
kWh
Electricity Demand $17,199 2,466
kW-mo/yr
Natural Gas $41,657 3,655
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,324 - $3,324
33,336
kWh
- -
02 2.7135: Install occupancy sensors $1,657 $1,518 $1,258
10,373
kWh
$399
-
kW-mo/yr
-
03 2.7231: Use radiant heater for spot heating $1,094 $2,088 $804
6,630
kWh
$290
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $209 $587 $167
1,028
kWh
$42
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $977 $4,281 $718
5,920
kWh
$259
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,529 $30,407 $6,529
53,829
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,453 $38,867 $3,436
28,327
kWh
$1,017
-
kW-mo/yr
-
08 2.7232: Replace existing hvac unit with high efficiency model $2,116 $25,320 $1,368
11,279
kWh
$378
-
kW-mo/yr
$370
-
MMBtu
TOTAL RECOMMENDED $20,359 $103,068 $17,604
150,722
kWh
$2,385
-
kW-mo/yr
$370
-
MMBtu
TOTAL IMPLEMENTED $3,324 - $3,324
33,336
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs