ITAC Assessment: UD0065
ITAC logo
ITAC Assessment: UD0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PRINTING EQUIPMENT
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 645
Plant Area
n/a
Annual Production 150
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,381 8,511,723
kWh
Natural Gas $28,798 7,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,758 $72,939 $39,924
802,169
kWh
$(-3,166.0)
-
MMBtu
02 2.7233: Use properly designed and sized hvac equipment $1,440 $2,850 - $1,440
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $662 $200 $662
13,482
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,496 $1,000 $8,496
-
kWh
-
TOTAL RECOMMENDED $47,356 $76,989 $49,082
815,651
kWh
$(-1,726.0)
-
MMBtu
TOTAL IMPLEMENTED $662 $200 $662
13,482
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs