Assessment Year | 1982 |
---|---|
Principal Product | PULP & PAPER MILL EQUIPMENT |
NAICS |
n/a
|
SIC | 3554: Paper Industries Machinery |
Sales Range | $10 M to 50M |
# of Employees | 296 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,300
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $140,681 | 2,123,388 |
kWh
|
$0.066 |
Natural Gas | $68,867 | 15,609 |
MMBtu
|
$4.41 |
Fuel Oil #2 | $2,100 | 280 |
MMBtu
|
$7.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,497 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,652 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $12,885 | $11,043 | - |
$12,885
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,605 | $8,000 |
$12,505
147,714
kWh
|
- |
$2,100
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,486 | $2,126 |
$2,723
35,756
kWh
|
$(-237.0)
-
MMBtu
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $2,281 | $2,200 | - |
$2,281
-
MMBtu
|
- | |
05 | 2.6121: Reduce hot water temperature to the minimum required | $240 | $120 |
$240
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $32,497 | $23,489 |
$15,468
185,815
kWh
|
$14,929
-
MMBtu
|
$2,100
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,652 | $15,369 |
$2,723
35,756
kWh
|
$14,929
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs