Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product IND. MIXING EQUIPMENT
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,422 2,066,237
kWh
Natural Gas $87,782 20,050
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,558 $872 $3,233
54,513
kWh
$(-675.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $15,588 $146,250 - $15,588
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,264 $8,000 $1,004
18,757
kWh
$1,260
-
MMBtu
04 2.7494: Install storm windows and doors $20,425 $29,798 - $20,425
-
MMBtu
TOTAL RECOMMENDED $40,835 $184,920 $4,237
73,270
kWh
$36,598
-
MMBtu
TOTAL IMPLEMENTED $40,835 $184,920 $4,237
73,270
kWh
$36,598
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs