ITAC Assessment: UD0050
ITAC logo
ITAC Assessment: UD0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ADHESIVES & SEALANTS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 6,990,000
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,475 1,700,176
kWh
Natural Gas $32,044 8,687
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,868

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,891 $396 $2,416
38,101
kWh
$(-525.0)
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,817 $400 - $1,817
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $6,054 $2,800 $(-109.0)
(-1,465)
kWh
$6,163
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $1,051 $5,156 - $1,051
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $233 - $203
2,931
kWh
$30
-
MMBtu
TOTAL RECOMMENDED $11,046 $8,752 $2,510
39,567
kWh
$8,536
-
MMBtu
TOTAL IMPLEMENTED $2,868 $5,556 - $2,868
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs