Assessment Year | 1982 |
---|---|
Principal Product | AIR RECEIVER TANKS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 90,000
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,882 | 2,226,846 |
kWh
|
$0.050 |
Natural Gas | $34,997 | 9,478 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,576 | $1,603 |
$5,090
81,770
kWh
|
$(-514.0)
-
MMBtu
|
|
02 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $4,904 | $2,500 |
$4,904
63,892
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $815 | $600 |
$815
16,413
kWh
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,992 | $1,000 |
$4,992
-
kWh
|
- | |
TOTAL RECOMMENDED | $15,287 | $5,703 |
$15,801
162,075
kWh
|
$(-514.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs