| Assessment Year | 1982 |
|---|---|
| Principal Product | AIR RECEIVER TANKS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 90,000
pieces
|
| Production Hrs. Annual | 4,400
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $110,882 | 2,226,846 |
kWh
|
$0.050 |
| Natural Gas | $34,997 | 9,478 |
MMBtu
|
$3.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,576 | $1,603 |
$5,090
81,770
kWh
|
$(-514.0)
-
MMBtu
|
|
| 02 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $4,904 | $2,500 |
$4,904
63,892
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $815 | $600 |
$815
16,413
kWh
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,992 | $1,000 |
$4,992
-
kWh
|
- | |
| TOTAL RECOMMENDED | $15,287 | $5,703 |
$15,801
162,075
kWh
|
$(-514.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs