ITAC Assessment: UD0042
ITAC logo
ITAC Assessment: UD0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AIRCRAFT ELECTRICAL EQUIPMENT
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,402 1,982,122
kWh
Natural Gas $55,786 15,067
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,309 $1,610 $5,309
76,202
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,870 $1,450 - $3,870
-
MMBtu
03 2.7261: Install timers and/or thermostats $6,580 $139 $457
9,086
kWh
$6,123
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $2,997 - - $2,997
-
MMBtu
05 2.7421: Reduce glazed areas in buildings $1,633 $3,410 - $1,633
-
MMBtu
06 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $866 $4,000 - $866
-
MMBtu
TOTAL RECOMMENDED $21,255 $10,609 $5,766
85,288
kWh
$15,489
-
MMBtu
TOTAL IMPLEMENTED $21,255 $10,609 $5,766
85,288
kWh
$15,489
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs