ITAC Assessment: UF0564
ITAC logo
ITAC Assessment: UF0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 15,000
ft2
Annual Production 1,860,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,004 8,644,800
kWh
Electricity Demand $104,997 16,254
kW-mo/yr
Electricity Fees $49,627 -
Natural Gas $59,416 4,433
MMBtu
TOTAL YEARLY COSTS $622,044
RECOMMENDED SAVINGS* $746,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
01 2.1336: Install equipment to utilize waste fuel $235,547 $75,000 $148,224
3,153,693
kWh
$27,907
-
kW-mo/yr
$59,416
-
MMBtu
- - - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $74,329 $45,478 $74,329
1,581,463
kWh
- - - - - - -
03 2.4133: Use most efficient type of electric motors $52,001 $14,132 $43,282
920,901
kWh
$8,719
-
kW-mo/yr
- - - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,376 - $2,015
42,872
kWh
- - $174 - $187 - -
05 2.7135: Install occupancy sensors $1,115 $4,140 $1,115
23,730
kWh
- - - - - - -
06 4.122: Develop standard procedures to improve internal yields $378,782 $1,857,200 $(-5,147.0)
(-109,500)
kWh
$(-969.0)
-
kW-mo/yr
- - $301,698 - - $83,200
07 4.662: Level one – add communication using iiot devices to existing control system to modify operations $2,153 - - - - - - - $2,153 -
TOTAL RECOMMENDED $746,303 $1,995,950 $263,818
5,613,159
kWh
$35,657
-
kW-mo/yr
$59,416
-
MMBtu
$174 $301,698 $187 $2,153 $83,200
TOTAL IMPLEMENTED $131,974 $63,750 $120,741
2,568,966
kWh
$8,719
-
kW-mo/yr
- $174 - $187 $2,153 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs