Assessment Year | 1982 |
---|---|
Principal Product | AUTOMATIC CONTROL EQUIPMENT |
NAICS |
n/a
|
SIC | 3625: Relays and Industrial Controls |
Sales Range | $10 M to 50M |
# of Employees | 218 |
Plant Area |
n/a
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,203 | 1,808,031 |
kWh
|
$0.052 |
Fuel Oil #2 | $15,550 | 1,890 |
MMBtu
|
$8.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,090 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,698 | $1,557 |
$5,698
99,941
kWh
|
- | - | |
02 | 2.6121: Reduce hot water temperature to the minimum required | $480 | - |
$480
9,379
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $357 | $300 |
$357
7,034
kWh
|
- | - | |
04 | 2.1332: Convert combustion equipment to burn natural gas | $7,302 | $13,500 | - |
$(-8,248.0)
-
MMBtu
|
$15,550
-
MMBtu
|
|
05 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,253 | $7,000 |
$1,253
24,326
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,090 | $22,357 |
$7,788
140,680
kWh
|
$(-8,248.0)
-
MMBtu
|
$15,550
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,090 | $22,357 |
$7,788
140,680
kWh
|
$(-8,248.0)
-
MMBtu
|
$15,550
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs