ITAC Assessment: UD0039
ITAC logo
ITAC Assessment: UD0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AUTOMATIC CONTROL EQUIPMENT
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 218
Plant Area
n/a
Annual Production 1,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,203 1,808,031
kWh
Fuel Oil #2 $15,550 1,890
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,698 $1,557 $5,698
99,941
kWh
- -
02 2.6121: Reduce hot water temperature to the minimum required $480 - $480
9,379
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $357 $300 $357
7,034
kWh
- -
04 2.1332: Convert combustion equipment to burn natural gas $7,302 $13,500 - $(-8,248.0)
-
MMBtu
$15,550
-
MMBtu
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,253 $7,000 $1,253
24,326
kWh
- -
TOTAL RECOMMENDED $15,090 $22,357 $7,788
140,680
kWh
$(-8,248.0)
-
MMBtu
$15,550
-
MMBtu
TOTAL IMPLEMENTED $15,090 $22,357 $7,788
140,680
kWh
$(-8,248.0)
-
MMBtu
$15,550
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs