ITAC Assessment: UD0037
ITAC logo
ITAC Assessment: UD0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,197 1,593,787
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $935 $379 $935
17,292
kWh
02 2.6121: Reduce hot water temperature to the minimum required $350 - $350
6,448
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,116 $300 $1,116
20,516
kWh
04 2.2437: Recover waste heat from equipment $3,573 $3,500 $3,573
65,944
kWh
05 2.7492: Use proper thickness of insulation on building envelope $1,974 $6,500 $1,974
36,635
kWh
TOTAL RECOMMENDED $7,948 $10,679 $7,948
146,835
kWh
TOTAL IMPLEMENTED $3,573 $3,500 $3,573
65,944
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs