ITAC Assessment: UD0032
ITAC logo
ITAC Assessment: UD0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product WOMEN'S SHOES
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 960,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,538 982,122
kWh
Natural Gas $19,016 4,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7123: Keep lamps and reflectors clean $223 $5 $223
2,931
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $617 $3,206 $363
5,569
kWh
$254
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $349 $1,141 - $349
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,816 $21,800 $9,696
93,494
kWh
$(-1,880.0)
-
MMBtu
05 2.7494: Install storm windows and doors $2,478 $6,000 - $2,478
-
MMBtu
TOTAL RECOMMENDED $11,483 $32,152 $10,282
101,994
kWh
$1,201
-
MMBtu
TOTAL IMPLEMENTED $11,483 $32,152 $10,282
101,994
kWh
$1,201
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs