ITAC Assessment: MA0756
ITAC logo
ITAC Assessment: MA0756
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Computer Electronics and Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 39,880
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,743
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,365 3,379,000
kWh
Electricity Demand $33,042 8,429
kW-mo/yr
Electricity Fees $2,554 -
Natural Gas $38,776 3,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,102 $6,500 $8,102
59,836
kWh
- -
02 2.7135: Install occupancy sensors $6,277 $2,320 $6,277
46,363
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $3,797 $7,000 $3,797
28,045
kWh
- -
04 2.7314: Reduce ventilation air $1,278 $1,000 $616
4,546
kWh
- $662
-
MMBtu
05 2.2531: Re-size charging openings or add movable cover or door $1,508 $10,800 - - $1,508
-
MMBtu
06 2.3212: Optimize plant power factor $576 $1,392 - $576
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,538 $29,012 $18,792
138,790
kWh
$576
-
kW-mo/yr
$2,170
-
MMBtu
TOTAL IMPLEMENTED $11,899 $13,500 $11,899
87,881
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs