| Assessment Year | 2016 |
|---|---|
| Principal Product | Computer Electronics and Printed Circuit Boards |
| NAICS | 334412: Bare Printed Circuit Board Manufacturing |
| SIC | 3672: Printed Circuit Boards |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
39,880
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 4,743
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $457,365 | 3,379,000 |
kWh
|
$0.14 |
| Electricity Demand | $33,042 | 8,429 |
kW-mo/yr
|
$3.92 |
| Electricity Fees | $2,554 | - |
|
- |
| Natural Gas | $38,776 | 3,805 |
MMBtu
|
$10.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,899 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,102 | $6,500 |
$8,102
59,836
kWh
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $6,277 | $2,320 |
$6,277
46,363
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,797 | $7,000 |
$3,797
28,045
kWh
|
- | - | |
| 04 | 2.7314: Reduce ventilation air | $1,278 | $1,000 |
$616
4,546
kWh
|
- |
$662
-
MMBtu
|
|
| 05 | 2.2531: Re-size charging openings or add movable cover or door | $1,508 | $10,800 | - | - |
$1,508
-
MMBtu
|
|
| 06 | 2.3212: Optimize plant power factor | $576 | $1,392 | - |
$576
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $21,538 | $29,012 |
$18,792
138,790
kWh
|
$576
-
kW-mo/yr
|
$2,170
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,899 | $13,500 |
$11,899
87,881
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs