ITAC Assessment: UD0028
ITAC logo
ITAC Assessment: UD0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AIRCRAFT ENGINE PARTS
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 207
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,632 2,135,991
kWh
Fuel Oil #2 $36,031 5,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $828 $482 $828
13,482
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,052 - $7,052
-
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $205 $400 $205
4,103
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $516 $250 - $516
-
MMBtu
TOTAL RECOMMENDED $8,601 $1,132 $8,085
17,585
kWh
$516
-
MMBtu
TOTAL IMPLEMENTED $8,396 $732 $7,880
13,482
kWh
$516
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs