Assessment Year | 1982 |
---|---|
Principal Product | AIRCRAFT ENGINE PARTS |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 207 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $112,632 | 2,135,991 |
kWh
|
$0.053 |
Fuel Oil #2 | $36,031 | 5,089 |
MMBtu
|
$7.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,396 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $828 | $482 |
$828
13,482
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,052 | - |
$7,052
-
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $205 | $400 |
$205
4,103
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $516 | $250 | - |
$516
-
MMBtu
|
|
TOTAL RECOMMENDED | $8,601 | $1,132 |
$8,085
17,585
kWh
|
$516
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,396 | $732 |
$7,880
13,482
kWh
|
$516
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs