ITAC Assessment: UD0026
ITAC logo
ITAC Assessment: UD0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CUSTOM METAL FABRICATION
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,325
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,732 252,931
kWh
Natural Gas $3,561 1,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6122: Adjust vents to minimize energy use $97 $20 - $97
-
MMBtu
02 2.6121: Reduce hot water temperature to the minimum required $114 - $114
1,758
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $297 $48 $297
4,689
kWh
-
04 2.7261: Install timers and/or thermostats $699 $300 $699
11,137
kWh
-
TOTAL RECOMMENDED $1,207 $368 $1,110
17,584
kWh
$97
-
MMBtu
TOTAL IMPLEMENTED $297 $48 $297
4,689
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs