ITAC Assessment: UC2608
ITAC logo
ITAC Assessment: UC2608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aerospace
NAICS 336411: Aircraft Manufacturing
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 50,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,661 2,928,636
kWh
Electricity Demand $118,140 5,352
kW-mo/yr
Electricity Fees $2,906 -
LPG $12,990 499
MMBtu
TOTAL YEARLY COSTS $502,696
RECOMMENDED SAVINGS* $18,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,873 $715 $1,579
12,544
kWh
$294
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,592 - $5,109
40,579
kWh
$1,483
-
kW-mo/yr
-
03 2.7314: Reduce ventilation air $1,410 $6,600 $854
6,781
kWh
$556
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,558 $1,500 $4,105
32,624
kWh
$1,002
-
kW-mo/yr
$2,451
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $902 $2,450 $772
6,132
kWh
$130
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,335 $11,265 $12,419
98,660
kWh
$3,465
-
kW-mo/yr
$2,451
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs