| Assessment Year | 2003 |
|---|---|
| Principal Product | Poultry Processing and Packaging |
| NAICS | 311615: Poultry Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $100 M to 500M |
| # of Employees | 920 |
| Plant Area |
101,380
ft2
|
| Annual Production | 70,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $542,790 | 25,683,698 |
kWh
|
$0.021 |
| Electricity Demand | $230,967 | 57,024 |
kW-mo/yr
|
$4.05 |
| Electricity Fees | $540,844 | - |
|
- |
| Natural Gas | $591,285 | 141,750 |
MMBtu
|
$4.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,643 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $3,773 | $8,717 | - | - |
$3,773
-
MMBtu
|
- | - | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $6,638 | $7,445 | - | - |
$6,638
-
MMBtu
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $279 | $300 | - | - |
$279
-
MMBtu
|
- | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,891 | $450 | - | - |
$3,891
-
MMBtu
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $930 | $1,017 |
$930
43,472
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $996 | $4,003 |
$505
23,582
kWh
|
$206
-
kW-mo/yr
|
- | $285 | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,433 | $113,760 |
$28,433
1,328,849
kWh
|
- | - | - | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,839 | $1,606 | - |
$20,839
-
kW-mo/yr
|
- | - | - | |
| 09 | 3.4115: Recover and reuse cooling water | $23,652 | $4,495 | - | - | - | - |
$23,652
-
Tgal
|
|
| TOTAL RECOMMENDED | $89,431 | $141,793 |
$29,868
1,395,903
kWh
|
$21,045
-
kW-mo/yr
|
$14,581
-
MMBtu
|
$285 |
$23,652
-
Tgal
|
||
| TOTAL IMPLEMENTED | $32,643 | $13,804 |
$505
23,582
kWh
|
$21,045
-
kW-mo/yr
|
$10,808
-
MMBtu
|
$285 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs