ITAC Assessment: OK0660
ITAC logo
ITAC Assessment: OK0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Poultry Processing and Packaging
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 920
Plant Area 101,380
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,790 25,683,698
kWh
Electricity Demand $230,967 57,024
kW-mo/yr
Electricity Fees $540,844 -
Natural Gas $591,285 141,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $3,773 $8,717 - - $3,773
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $6,638 $7,445 - - $6,638
-
MMBtu
- -
03 2.2511: Insulate bare equipment $279 $300 - - $279
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,891 $450 - - $3,891
-
MMBtu
- -
05 2.7135: Install occupancy sensors $930 $1,017 $930
43,472
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $996 $4,003 $505
23,582
kWh
$206
-
kW-mo/yr
- $285 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,433 $113,760 $28,433
1,328,849
kWh
- - - -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,839 $1,606 - $20,839
-
kW-mo/yr
- - -
09 3.4115: Recover and reuse cooling water $23,652 $4,495 - - - - $23,652
-
Tgal
TOTAL RECOMMENDED $89,431 $141,793 $29,868
1,395,903
kWh
$21,045
-
kW-mo/yr
$14,581
-
MMBtu
$285 $23,652
-
Tgal
TOTAL IMPLEMENTED $32,643 $13,804 $505
23,582
kWh
$21,045
-
kW-mo/yr
$10,808
-
MMBtu
$285 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs