| Assessment Year | 2026 |
|---|---|
| Principal Product | Metal fabrication and custom-built products |
| NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $100 M to 500M |
| # of Employees | 55 |
| Plant Area |
1,200,000
ft2
|
| Annual Production | 100,000,000
units
|
| Production Hrs. Annual | 3,600
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,144 | 1,025,533 |
kWh
|
$0.19 |
| Electricity Demand | $64,640 | 4,541 |
kW-mo/yr
|
$14.24 |
| Electricity Fees | $4,987 | - |
|
- |
| Natural Gas | $79,792 | 5,328 |
MMBtu
|
$14.98 |
| TOTAL YEARLY COSTS | $346,563 | |||
| RECOMMENDED SAVINGS* | $39,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $4,987 | - | - | - | - | $4,987 | |
| 02 | 2.8123: Pay utility bills on time | $3,302 | - | - | - | $3,302 | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,741 | $822 |
$2,485
12,981
kWh
|
$256
-
kW-mo/yr
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $5,929 | $1,140 |
$5,382
28,005
kWh
|
$546
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,153 | - |
$20,112
104,641
kWh
|
$2,041
-
kW-mo/yr
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $336 | $966 |
$292
1,520
kWh
|
$44
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $39,448 | $2,927 |
$28,272
147,147
kWh
|
$2,887
-
kW-mo/yr
|
$3,302 | $4,987 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs