| Assessment Year | 2000 |
|---|---|
| Principal Product | plastic sheets and bags |
| NAICS |
n/a
|
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $50 M to 100M |
| # of Employees | 230 |
| Plant Area |
205,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $558,477 | 24,799,238 |
kWh
|
$0.023 |
| Electricity Demand | $426,229 | 41,484 |
kW-mo/yr
|
$10.27 |
| Natural Gas | $164,501 | 55,345 |
MMBtu
|
$2.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,785 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,605 | $18,341 |
$3,262
145,076
kWh
|
$3,343
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,391 | - |
$2,457
109,320
kWh
|
$1,934
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $146 | $665 |
$146
6,448
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,021 | $163 |
$1,714
76,202
kWh
|
$1,307
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,385 | $170 |
$1,285
57,151
kWh
|
$1,100
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $977 | $32 |
$550
24,326
kWh
|
$427
-
kW-mo/yr
|
- | - | |
| 07 | 2.1213: Direct warmest air to combustion intake | $316 | $78 | - | - |
$316
-
MMBtu
|
- | |
| 08 | 4.322: Eliminate old stock and modify inventory control | $34,944 | $38,000 | - | - | - | $34,944 | |
| TOTAL RECOMMENDED | $52,785 | $57,449 |
$9,414
418,523
kWh
|
$8,111
-
kW-mo/yr
|
$316
-
MMBtu
|
$34,944 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs