Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product plastic sheets and bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 205,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $558,477 24,799,238
kWh
Electricity Demand $426,229 41,484
kW-mo/yr
Natural Gas $164,501 55,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,605 $18,341 $3,262
145,076
kWh
$3,343
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,391 - $2,457
109,320
kWh
$1,934
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $146 $665 $146
6,448
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,021 $163 $1,714
76,202
kWh
$1,307
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $2,385 $170 $1,285
57,151
kWh
$1,100
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $977 $32 $550
24,326
kWh
$427
-
kW-mo/yr
- -
07 2.1213: Direct warmest air to combustion intake $316 $78 - - $316
-
MMBtu
-
08 4.322: Eliminate old stock and modify inventory control $34,944 $38,000 - - - $34,944
TOTAL RECOMMENDED $52,785 $57,449 $9,414
418,523
kWh
$8,111
-
kW-mo/yr
$316
-
MMBtu
$34,944
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs