ITAC Assessment: UC2514
ITAC logo
ITAC Assessment: UC2514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aircraft parts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 253
Plant Area 189,080
ft2
Annual Production 295,470
units
Production Hrs. Annual 6,214
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $437,367 2,320,956
kWh
Electricity Demand $89,512 4,956
kW-mo/yr
Electricity Fees $67,727 -
Natural Gas $253,474 34,087
MMBtu
TOTAL YEARLY COSTS $848,079
RECOMMENDED SAVINGS* $263,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $5,770 - - - - $5,770
02 2.8114: Change rate schedules or other changes in utility service $107,691 - - - - $107,691
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,996 $3,315 $2,908
15,434
kWh
$88
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,740 $150 $6,564
35,045
kWh
$1,176
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42 $57 $37
197
kWh
$5
-
kW-mo/yr
- -
06 2.7229: Air condition only space necessary $68 - $68
360
kWh
- - -
07 2.2511: Insulate bare equipment $579 $464 - - $579
-
MMBtu
-
08 2.7232: Replace existing hvac unit with high efficiency model $46,365 $258,963 $45,874
243,490
kWh
$491
-
kW-mo/yr
- -
09 2.9114: Use solar heat to make electricty $90,908 $710,557 $90,908
482,526
kWh
- - -
10 2.6218: Turn off equipment when not in use $1,049 - $926
4,913
kWh
$123
-
kW-mo/yr
- -
11 2.2511: Insulate bare equipment $467 $505 - - $467
-
MMBtu
-
TOTAL RECOMMENDED $263,673 $974,011 $147,284
781,965
kWh
$1,883
-
kW-mo/yr
$1,046
-
MMBtu
$113,460
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs