ITAC Assessment: UC2404
ITAC logo
ITAC Assessment: UC2404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aircraft Engine Parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 134
Plant Area 133,000
ft2
Annual Production 85,000
units
Production Hrs. Annual 5,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $626,247 5,184,240
kWh
Electricity Demand $211,843 11,156
kW-mo/yr
Electricity Fees $15,337 -
Natural Gas $21,607 1,518
MMBtu
Waste Disposal Costs
Water Usage $6,175 574
Tgal
TOTAL YEARLY COSTS $881,210
RECOMMENDED SAVINGS* $254,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $17,174 - - - $17,174
02 2.8123: Pay utility bills on time $1,575 - - - $1,575
03 2.3212: Optimize plant power factor $4,186 $21,381 - - $4,186
04 2.4323: Use optimum size and capacity equipment $15,710 $84,000 $12,926
107,008
kWh
$2,784
-
kW-mo/yr
-
05 2.6231: Utilize controls to operate equipment only when needed $12,057 $90 $12,057
99,815
kWh
- -
06 2.9114: Use solar heat to make electricty $197,215 $1,521,757 $197,215
1,632,598
kWh
- -
07 2.4133: Use most efficient type of electric motors $6,858 $17,884 $5,643
46,711
kWh
$1,215
-
kW-mo/yr
-
TOTAL RECOMMENDED $254,775 $1,645,112 $227,841
1,886,132
kWh
$3,999
-
kW-mo/yr
$22,935
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs