Assessment Year | 1992 |
---|---|
Principal Product | SILICONE RUBBER HOSES |
NAICS |
n/a
|
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,127 | 787,808 |
kWh
|
$0.14 |
Fuel Oil #2 | $26,466 | 5,040 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,589 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $15,035 | $1 |
$(-1,380.0)
(-9,965)
kWh
|
- | $16,415 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,491 | - |
$1,850
13,482
kWh
|
- | $(-359.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,299 | $3,325 |
$1,299
9,379
kWh
|
- | - | |
04 | 2.2113: Repair or replace steam traps | $2,740 | $2 | - |
$3,365
-
MMBtu
|
$(-625.0) | |
05 | 2.2122: Install / repair insulation on condensate lines | $530 | $117 | - |
$530
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $515 | $245 | - |
$515
-
MMBtu
|
- | |
07 | 2.4312: Improve lubrication practices | $284 | - |
$284
2,052
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $284 | $241 |
$284
2,052
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,178 | $3,931 |
$2,337
17,000
kWh
|
$4,410
-
MMBtu
|
$15,431 | ||
TOTAL IMPLEMENTED | $19,589 | $3,573 |
$(-81.0)
(-586)
kWh
|
$3,880
-
MMBtu
|
$15,790 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs