ITAC Assessment: UC2307
ITAC logo
ITAC Assessment: UC2307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chemical product
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 99,250
ft2
Annual Production 15,492,415
lb
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,715 433,488
kWh
Electricity Demand $31,649 1,697
kW-mo/yr
Electricity Fees $20,189 -
Natural Gas $39,743 3,214
MMBtu
LPG $3,359 75
MMBtu
Fuel Oil #4 $24,708 837
MMBtu
Waste Disposal Costs
Water Usage $2,722 768
Tgal
Water Disposal $3,834 726
Tgal
TOTAL YEARLY COSTS $143,920
RECOMMENDED SAVINGS* $37,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $12,379 - - - $12,379 - - - - - -
02 2.3192: Use fossil fuel powered generator during peak demand periods $4,994 - $151
3,696
kWh
$1,436
-
kW-mo/yr
$4,670 - $(-1,263.4)
-
MMBtu
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $352 - - - - $832
-
MMBtu
- - - - $(-480.0)
04 2.1224: Replace boiler $6,269 $41,061 - - - $6,269
-
MMBtu
- - - - -
05 2.2136: Install / repair insulation on steam lines $508 $529 - - - $508
-
MMBtu
- - - - -
06 2.7232: Replace existing hvac unit with high efficiency model $411 $3,486 $253
6,192
kWh
$158
-
kW-mo/yr
- - - - - - -
07 3.4114: Replace city water with recycled water via cooling tower $3,643 $34,992 $(-517.3)
(-12,647)
kWh
$(-323.1)
-
kW-mo/yr
- - - - $1,799
-
Tgal
$2,684
-
Tgal
-
08 3.4155: Meter waste water $383 $455 - - - - - - - $383
-
Tgal
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $6,108 $31,637 $(-531.8)
(-13,003)
kWh
$(-1,369.4)
-
kW-mo/yr
- $8,010
-
MMBtu
- - - - -
10 2.1332: Convert combustion equipment to burn natural gas $2,667 $13,200 - - - $(-1,923.6)
-
MMBtu
- $4,590
-
MMBtu
- - -
TOTAL RECOMMENDED $37,715 $125,360 $(-644.7)
(-15,762)
kWh
$(-98.3)
-
kW-mo/yr
$17,049 $13,695
-
MMBtu
$(-1,263.4)
-
MMBtu
$4,590
-
MMBtu
$1,799
-
Tgal
$3,067
-
Tgal
$(-480.0)
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs