ITAC Assessment: MA0248
ITAC logo
ITAC Assessment: MA0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FROZEN CHICKEN ENTREES
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 352
Plant Area
n/a
Annual Production 26,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,785 3,978,898
kWh
Natural Gas $56,015 9,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $13,681 $30,404 $(-616.0)
(-6,741)
kWh
$14,297
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,051 $10 - $3,051
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $2,622 $1,872 - $2,622
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,618 $(-2,762.0) $3,618
39,566
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,229 $7,164 $1,229
13,482
kWh
-
06 2.6232: Install set-back timers $268 $150 $268
2,931
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $829 - $829
9,086
kWh
-
TOTAL RECOMMENDED $25,298 $36,838 $5,328
58,324
kWh
$19,970
-
MMBtu
TOTAL IMPLEMENTED $5,673 $1,882 - $5,673
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs