Assessment Year | 1985 |
---|---|
Principal Product | MILK,COTT CHEESE,ICE CREAM |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 48,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,229 | 3,405,920 |
kWh
|
$0.054 |
Natural Gas | $73,160 | 14,921 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,812 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,088 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $229 | $50 |
$229
4,396
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,071 | $500 | - |
$4,071
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $1,658 | $8,000 | - |
$1,658
-
MMBtu
|
|
04 | 2.1222: Install turbulators | $2,037 | $1,200 | - |
$2,037
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $293 | $150 |
$293
5,569
kWh
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,718 | $960 |
$1,718
31,946
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $2,299 | $1,000 |
$1,508
28,136
kWh
|
$791
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,507 | $812 |
$1,507
28,136
kWh
|
- | |
TOTAL RECOMMENDED | $13,812 | $12,672 |
$5,255
98,183
kWh
|
$8,557
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,088 | $2,460 |
$3,226
60,082
kWh
|
$4,862
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs