ITAC Assessment: CO0037
ITAC logo
ITAC Assessment: CO0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MILK,COTT CHEESE,ICE CREAM
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 48,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,229 3,405,920
kWh
Natural Gas $73,160 14,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,088

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $229 $50 $229
4,396
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,071 $500 - $4,071
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $1,658 $8,000 - $1,658
-
MMBtu
04 2.1222: Install turbulators $2,037 $1,200 - $2,037
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $293 $150 $293
5,569
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,718 $960 $1,718
31,946
kWh
-
07 2.2511: Insulate bare equipment $2,299 $1,000 $1,508
28,136
kWh
$791
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,507 $812 $1,507
28,136
kWh
-
TOTAL RECOMMENDED $13,812 $12,672 $5,255
98,183
kWh
$8,557
-
MMBtu
TOTAL IMPLEMENTED $8,088 $2,460 $3,226
60,082
kWh
$4,862
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs