Assessment Year | 2023 |
---|---|
Principal Product | Metal casting |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
51,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,401 | 744,960 |
kWh
|
$0.11 |
Electricity Demand | $60,592 | 4,021 |
kW-mo/yr
|
$15.07 |
Electricity Fees | $5,267 | - |
|
- |
Natural Gas | $7,063 | 402 |
MMBtu
|
$17.57 |
Fuel Oil #2 | $13,647 | 522 |
MMBtu
|
$26.15 |
TOTAL YEARLY COSTS | $164,970 | |||
RECOMMENDED SAVINGS* | $97,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $378 | $464 |
$193
1,834
kWh
|
$166
-
kW-mo/yr
|
- | - | $19 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,727 | $500 |
$1,893
17,990
kWh
|
$834
-
kW-mo/yr
|
- | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $12,731 | $500 |
$12,731
120,957
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,359 | $2,800 |
$3,359
31,933
kWh
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $2,876 | $500 |
$2,876
27,331
kWh
|
- | - | - | - | |
06 | 2.1332: Convert combustion equipment to burn natural gas | $4,478 | $3,300 | - | - |
$(-9,169.3)
-
MMBtu
|
$13,647
-
MMBtu
|
- | |
07 | 2.9114: Use solar heat to make electricty | $70,713 | $379,682 |
$59,314
563,821
kWh
|
$18,988
-
kW-mo/yr
|
- | - | $(-7,589.0) | |
TOTAL RECOMMENDED | $97,263 | $387,746 |
$80,367
763,866
kWh
|
$19,988
-
kW-mo/yr
|
$(-9,169.3)
-
MMBtu
|
$13,647
-
MMBtu
|
$(-7,569.8) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs