ITAC Assessment: MO0138
ITAC logo
ITAC Assessment: MO0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product aluminum and magnesium extrusions
NAICS
n/a
SIC 3490:
Sales Range $50
M
to 100
M
# of Employees 365
Plant Area 1,458,375
ft2
Annual Production 43,001,342
lb
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,275,573 35,080,012
kWh
Natural Gas $1,838,637 625,918
MMBtu
LPG $244,719 47,416
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $40,772 - - - - $40,772
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,269 $848 $7,269
112,251
kWh
- - -
03 2.1223: Install smaller boiler (increase high fire duty cycle) $19,282 $4,373 - $207
-
MMBtu
$19,075
-
Tgal
-
04 2.4133: Use most efficient type of electric motors $13,554 $46,209 $13,554
208,968
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,489 $4,070 $9,489
146,249
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,397 $3,220 $1,397
21,688
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,389 $16,600 $3,389
52,169
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,657 $536 $1,657
25,498
kWh
- - -
TOTAL RECOMMENDED $96,809 $75,856 $36,755
566,823
kWh
$207
-
MMBtu
$19,075
-
Tgal
$40,772
TOTAL IMPLEMENTED $66,641 $64,193 $25,869
398,886
kWh
- - $40,772
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs