| Assessment Year | 1995 |
|---|---|
| Principal Product | aluminum and magnesium extrusions |
| NAICS |
n/a
|
| SIC | 3490: |
| Sales Range | $50 M to 100M |
| # of Employees | 365 |
| Plant Area |
1,458,375
ft2
|
| Annual Production | 43,001,342
lb
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,275,573 | 35,080,012 |
kWh
|
$0.065 |
| Natural Gas | $1,838,637 | 625,918 |
MMBtu
|
$2.94 |
| LPG | $244,719 | 47,416 |
MMBtu
|
$5.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $96,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,641 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8123: Pay utility bills on time | $40,772 | - | - | - | - | $40,772 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,269 | $848 |
$7,269
112,251
kWh
|
- | - | - | |
| 03 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $19,282 | $4,373 | - |
$207
-
MMBtu
|
$19,075
-
Tgal
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $13,554 | $46,209 |
$13,554
208,968
kWh
|
- | - | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,489 | $4,070 |
$9,489
146,249
kWh
|
- | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,397 | $3,220 |
$1,397
21,688
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,389 | $16,600 |
$3,389
52,169
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,657 | $536 |
$1,657
25,498
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $96,809 | $75,856 |
$36,755
566,823
kWh
|
$207
-
MMBtu
|
$19,075
-
Tgal
|
$40,772 | ||
| TOTAL IMPLEMENTED | $66,641 | $64,193 |
$25,869
398,886
kWh
|
- | - | $40,772 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs