ITAC Assessment: UC2206
ITAC logo
ITAC Assessment: UC2206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 19
Plant Area 80,000
ft2
Annual Production 3,285,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,490 5,392,290
kWh
Electricity Demand $150,083 9,765
kW-mo/yr
Electricity Fees $4,378 -
Fuel Oil #2 $2,676 123
MMBtu
TOTAL YEARLY COSTS $741,627
RECOMMENDED SAVINGS* $128,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $31,115 - $1,268
11,700
kWh
$3,996
-
kW-mo/yr
$32,500 - - $(-6,649.2) -
02 2.6231: Utilize controls to operate equipment only when needed $4,557 $1,500 $2,880
26,568
kWh
$1,677
-
kW-mo/yr
- - - - -
03 2.6231: Utilize controls to operate equipment only when needed $57,154 $500 $47,859
441,504
kWh
$9,295
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $3,119 $33,560 $2,611
24,090
kWh
$507
-
kW-mo/yr
- - - - -
05 2.7232: Replace existing hvac unit with high efficiency model $2,660 $16,842 $552
5,094
kWh
$107
-
kW-mo/yr
- - - $400 $1,601
06 2.1332: Convert combustion equipment to burn natural gas $1,713 $3,300 - - - $(-962.8)
-
MMBtu
$2,676
-
MMBtu
- -
07 2.3141: Use battery storage for demand control $27,967 $231,837 $(-16,598.0)
(-153,118)
kWh
$51,597
-
kW-mo/yr
- - - $(-7,032.0) -
TOTAL RECOMMENDED $128,284 $287,539 $38,572
355,838
kWh
$67,179
-
kW-mo/yr
$32,500 $(-962.8)
-
MMBtu
$2,676
-
MMBtu
$(-13,281.2) $1,601
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs