ITAC Assessment: UA3029
ITAC logo
ITAC Assessment: UA3029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product pallets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area 20,000
ft2
Annual Production 780,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,917 719,613
kWh
Electricity Demand $33,038 5,506
kW-mo/yr
Electricity Fees $8,684 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $24,921 $9,630 - $23,466
-
kW-mo/yr
$1,455
02 2.4131: Size electric motors for peak operating efficiency $8,202 $7,598 $151
1,648
kWh
$7,578
-
kW-mo/yr
$473
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,059 $800 $572
6,244
kWh
$425
-
kW-mo/yr
$62
04 2.4231: Reduce the pressure of compressed air to the minimum required $858 $1,060 $426
4,646
kWh
$382
-
kW-mo/yr
$50
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,101 $907 $1,037
11,325
kWh
- $64
06 2.7261: Install timers and/or thermostats $1,023 $330 $963
10,510
kWh
- $60
TOTAL RECOMMENDED $37,164 $20,325 $3,149
34,373
kWh
$31,851
-
kW-mo/yr
$2,164
TOTAL IMPLEMENTED $2,940 $2,190 $1,961
21,400
kWh
$807
-
kW-mo/yr
$172
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs