Assessment Year | 2013 |
---|---|
Principal Product | Cement |
NAICS | 327310: Cement Manufacturing |
SIC | 3241: Cement, Hydraulic |
Sales Range | $100 M to 500M |
# of Employees | 107 |
Plant Area |
4,300,000
ft2
|
Annual Production | 1,000,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $7,284,777 | 112,073,496 |
kWh
|
$0.065 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $158,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $87,714 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $65,646 | $30,000 |
$65,646
1,009,932
kWh
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $29,047 | $800 |
$29,047
446,885
kWh
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $21,524 | $800 |
$21,524
331,140
kWh
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,585 | $18,890 |
$20,585
316,680
kWh
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,558 | $27,390 |
$16,558
254,730
kWh
|
|
06 | 2.4224: Upgrade controls on compressors | $5,142 | $300 |
$5,142
79,112
kWh
|
|
TOTAL RECOMMENDED | $158,502 | $78,180 |
$158,502
2,438,479
kWh
|
||
TOTAL IMPLEMENTED | $87,714 | $47,880 |
$87,714
1,349,435
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs