ITAC Assessment: UA3026
ITAC logo
ITAC Assessment: UA3026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $100
M
to 500
M
# of Employees 107
Plant Area 4,300,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,284,777 112,073,496
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4224: Upgrade controls on compressors $65,646 $30,000 $65,646
1,009,932
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $29,047 $800 $29,047
446,885
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $21,524 $800 $21,524
331,140
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,585 $18,890 $20,585
316,680
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,558 $27,390 $16,558
254,730
kWh
06 2.4224: Upgrade controls on compressors $5,142 $300 $5,142
79,112
kWh
TOTAL RECOMMENDED $158,502 $78,180 $158,502
2,438,479
kWh
TOTAL IMPLEMENTED $87,714 $47,880 $87,714
1,349,435
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs