ITAC Assessment: GT0638
ITAC logo
ITAC Assessment: GT0638
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Manufactured Homes
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 120,000
ft2
Annual Production 2,525
pieces
Production Hrs. Annual 2,146
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,207 1,269,050
kWh
Electricity Demand $25,646 3,559
kW-mo/yr
Electricity Fees $20,339 -
Natural Gas $17,540 2,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,643 $1,450 $5,064
99,941
kWh
$4,033
-
kW-mo/yr
$546 - - - -
02 2.4314: Use synthetic lubricant $1,637 - $911
17,878
kWh
$726
-
kW-mo/yr
- - - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $256 $240 $144
2,931
kWh
$112
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,147 $5,060 $3,006
82,649
kWh
- $141 - - - -
05 3.5311: Recover and reuse waste material $1,440 - - - - $1,440
-
lb
- - -
06 4.213: Purchase material from supplier in customized packaging $25,130 - - - - $288
-
lb
- $24,842 -
07 3.5311: Recover and reuse waste material $50,616 $60,000 - - - - $(-24,936.0) $78,156 $(-2,604.0)
08 2.6242: Minimize operation of equipment maintained in standby condition $4,321 $5,000 $2,277
45,135
kWh
$1,816
-
kW-mo/yr
$228 - - - -
TOTAL RECOMMENDED $96,190 $71,750 $11,402
248,534
kWh
$6,687
-
kW-mo/yr
$915 $1,728
-
lb
$(-24,936.0) $102,998 $(-2,604.0)
TOTAL IMPLEMENTED $90,429 $66,750 $9,125
203,399
kWh
$4,871
-
kW-mo/yr
$687 $288
-
lb
$(-24,936.0) $102,998 $(-2,604.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs