ITAC Assessment: UA3018
ITAC logo
ITAC Assessment: UA3018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Tissue Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 1,600,000
ft2
Annual Production 173,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,753,855 483,419,000
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $363,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,245 $6,500 $20,245
449,900
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,071 $100 $13,071
290,478
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,378 $7,500 $27,378
608,416
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,992 $200 $12,992
288,706
kWh
05 2.4224: Upgrade controls on compressors $25,349 $2,000 $25,349
564,312
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $174,953 $5,600 $174,953
3,287,854
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $89,207 $13,695 $89,207
1,982,371
kWh
TOTAL RECOMMENDED $363,195 $35,595 $363,195
7,472,037
kWh
TOTAL IMPLEMENTED $47,623 $14,000 $47,623
1,058,316
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs