ITAC Assessment: AS0272
ITAC logo
ITAC Assessment: AS0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Injection Molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 42,000
ft2
Annual Production 13,500
lb
Production Hrs. Annual 5,046
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,654 689,918
kWh
Electricity Demand $4,958 3,149
kW-mo/yr
Electricity Fees $72,330 -
LPG $3,777 334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $160 $145 $92
1,172
kWh
$19
-
kW-mo/yr
$24 $25
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,392 $14,863 $13,076
175,264
kWh
$2,316
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $502 $781 $430
5,862
kWh
$72
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $405 $525 $320
4,396
kWh
$85
-
kW-mo/yr
- -
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $365 $150 $365
4,982
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $299 $440 $255
2,931
kWh
$44
-
kW-mo/yr
- -
07 2.1332: Convert combustion equipment to burn natural gas $2,419 $295 - - $2,419 -
TOTAL RECOMMENDED $19,542 $17,199 $14,538
194,607
kWh
$2,536
-
kW-mo/yr
$2,443 $25
TOTAL IMPLEMENTED $18,772 $16,524 $13,853
185,229
kWh
$2,451
-
kW-mo/yr
$2,443 $25
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs