| Assessment Year | 2011 |
|---|---|
| Principal Product | Cardboard |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 55 |
| Plant Area |
166,000
ft2
|
| Annual Production | 1,350,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $228,514 | 4,924,800 |
kWh
|
$0.046 |
| Electricity Demand | $175,371 | 13,020 |
kW-mo/yr
|
$13.47 |
| Natural Gas | $749,115 | 77,106 |
MMBtu
|
$9.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $185,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,463 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,823 | $18,375 |
$10,640
229,320
kWh
|
$6,183
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,597 | $265 |
$233
5,031
kWh
|
$4,364
-
kW-mo/yr
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $592 | $623 |
$592
12,768
kWh
|
- | - | - | |
| 04 | 2.7261: Install timers and/or thermostats | $51,741 | $7,700 | - |
$51,741
-
kW-mo/yr
|
- | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $2,427 | $3,004 | - | - |
$2,427
-
MMBtu
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,000 | $800 |
$4,719
101,700
kWh
|
$3,281
-
kW-mo/yr
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,274 | $5,000 |
$11,577
249,513
kWh
|
$3,697
-
kW-mo/yr
|
- | - | |
| 08 | 2.2425: Use flue gases to heat process or service water | $22,812 | $64,000 | - | - |
$22,812
-
MMBtu
|
- | |
| 09 | 2.2511: Insulate bare equipment | $7,844 | $1,950 | - | - |
$7,844
-
MMBtu
|
- | |
| 10 | 3.4155: Meter waste water | $55,751 | $7,500 | - | - | - |
$55,751
-
Tgal
|
|
| TOTAL RECOMMENDED | $185,861 | $109,217 |
$27,761
598,332
kWh
|
$69,266
-
kW-mo/yr
|
$33,083
-
MMBtu
|
$55,751
-
Tgal
|
||
| TOTAL IMPLEMENTED | $20,463 | $5,888 |
$12,402
267,312
kWh
|
$8,061
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs