ITAC Assessment: UA3003
ITAC logo
ITAC Assessment: UA3003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Automotive Glass
NAICS 811122: Automotive Glass Replacement Shops
SIC 7536: Automotive Glass Replacement Shops
Sales Range $50
M
to 100
M
# of Employees 149
Plant Area 83,840
ft2
Annual Production 2,300,000
pieces
Production Hrs. Annual 4,768
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,575 3,873,823
kWh
Electricity Fees $311,581 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,940 $18,577 $24,940
343,089
kWh
02 2.7135: Install occupancy sensors $190 $129 $190
2,620
kWh
03 2.7135: Install occupancy sensors $120 $129 $120
1,650
kWh
04 2.7134: Use photocell controls $367 $1,000 $367
5,046
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,872 $640 $3,872
53,269
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,018 $1,500 $2,018
27,764
kWh
07 2.7447: Install vinyl strip / high speed / air curtain doors $5,858 $8,376 $5,858
80,582
kWh
08 2.7425: Clean or color roof to reduce solar load $1,679 $5,534 $1,679
23,100
kWh
TOTAL RECOMMENDED $39,044 $35,885 $39,044
537,120
kWh
TOTAL IMPLEMENTED $2,695 $2,758 $2,695
37,080
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs