ITAC Assessment: GT0662
ITAC logo
ITAC Assessment: GT0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Ceramic Bricks/Cloth/Fiber
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $100
M
to 500
M
# of Employees 787
Plant Area 1,742,000
ft2
Annual Production 185,000,000
lb
Production Hrs. Annual 7,920
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,092,616 84,149,767
kWh
Electricity Demand $1,416,890 117,917
kW-mo/yr
Electricity Fees $224,011 -
Natural Gas $2,535,356 874,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $649,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $616,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4239: Eliminate or reduce compressed air usage $16,196 $3,800 $3,291
102,872
kWh
$12,905
-
kW-mo/yr
- - - - - -
02 3.1191: Change procedures / equipment / operating conditions $22,317 $550 - - - - - - $22,317 -
03 4.131: Modify process to reduce material use/cost $424,479 $250,000 - - $191,235
-
lb
- - $233,244 - -
04 4.211: Consider use / purchase of bulk materials where possible $16,138 $30,000 - - $259
-
lb
$13,374 - $2,505 - -
05 2.7245: Use direct air supply to exhaust hoods $68,343 $60,000 $39,803
1,243,845
kWh
$28,540
-
kW-mo/yr
- - - - - -
06 3.4115: Recover and reuse cooling water $85,620 $30,000 - - - - - - - $85,620
-
Tgal
07 2.8114: Change rate schedules or other changes in utility service $1,775 - - - - - - - - $1,775
-
Tgal
08 2.8112: Combine utility meters $14,794 - - - - - $14,794 - - -
TOTAL RECOMMENDED $649,662 $374,350 $43,094
1,346,717
kWh
$41,445
-
kW-mo/yr
$191,494
-
lb
$13,374 $14,794 $235,749 $22,317 $87,395
-
Tgal
TOTAL IMPLEMENTED $616,955 $344,350 $43,094
1,346,717
kWh
$41,445
-
kW-mo/yr
$191,235
-
lb
- - $233,244 $22,317 $85,620
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs